Bando 2-5MS530 Banflex Combo Super-E Chemical Processing

Regular price $ 44.13
Tax included. Shipping calculated at checkout.
Description

Bando 2-5MS530 Banflex Combo Super-E Chemical ProcessingBando 2 5MS530 Ideally suited for short center distances and small diameter pulleys, BanFlex Combos banded construction minimizes or eliminates the turnover problem normally associated with small cross section belts. The ribbed construction provides superior flexibility while maintaining lateral stability. Precision molded, seamless polyurethane ribs provide maximum resistance to oil and traditional lubricants with virtually vibration free operation.

6 Engraving description O Engraving direction Engraved in horizontal Engraving color Black Attributes

5 a Front Face Code Standard Front Shaft Indicator None Heater Indicator No Heater Insulation Class F Inverter Code Inverter Duty KVA Code K Lifting Lugs Standard Lifting Lugs Locked Bearing Indicator Locked Bearing Max Speed 1800 rpm Motor Lead Exit Ko Box Motor Lead Termination Flying Leads Motor Lead Quantity/Wire Size 9 @ 14 AWG Motor Type 0738M Mounting Arrangement F1 Number of Poles 6 Overall Length 20

Price Class200

0 V Design Code B Drip Cover No Drip Cover Duty Rating CONT Efficiency @ 100% Load 95

EFM4102T SPEC

Amperes 134 A LRC 6

Standard NEMA MG-1 Frequency 60 Hz Voltage 200 V Number of poles 4 Degree of Protection IP55 Synchronous speed 1800 rpm Output rating 3 HP Mounting F-1 Flange Without Terminal box¹ Left position Enclosure IC411 - TEFC Electric Motors

TraneMOT6114

Bando - SF 1 3/16 The original sheave and pulley mounting system developed to facilitate installation and replacement of components

automatic Shaft Material SAE 1040/45 Carbon Steel Painting RAL 5009 202E (ISO 12944 - C4) Grounding Lugs Double Fan Cover material Cast Iron Tropicalized Painting Complete (200h) Joints Seal Permatex Fan material Plastic Bearing cap Yes- Bearing Cap Drip Cover Without Overload protector (phenolic) Without overload protector Connection Cables Quantity 6 Downloads

5 MOTOR TYPE JF OPPOSITE END BEARING 6203 SHAFT END BEARING 6203 AMBIENT 40 ROTATION CCW DRIVE END REV SERVICE FACTOR 1

7 a Armature Inertia 10

Easy Shipping

Quick Dispatch:

Your Bando 2-5MS530 Banflex Combo Super-E Chemical Processing orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 2-5MS530 Banflex Combo Super-E Chemical Processing ships.

Need Help?
Questions about Bando 2-5MS530 Banflex Combo Super-E Chemical Processing, sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 2-5MS530 Banflex Combo Super-E Chemical Processing in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>